Completed Projects

3 membrane panel furnaces for biomass steam boilers

Year: 2016
Place: Synthetic fibre factory in Kaunas, Lithuania
Customer: Enerstena, UAB
Accomplished tasks: Manufacturing of 3 membrane panel furnaces for biomass steam boilers. Overall amount - around 40 t.
Type: Manufacture

Shell for economizer

Year: 2016
Place: France
Accomplished tasks: Manufacturing of shell for economizer, around 50 t
Type: Manufacture

Disassembling of Methanol Plant

Year: 2015–2016
Place: Fertilizer plant in Jonava, Lithuania
Customer: Iremas, UAB
Accomplished tasks: Disassembling of methanol plant, rectification columns and mechanical equipment as well as loading to vehicles. Overall amount disassembled: 520 t of equipment, 150 t of pipelines and 60 t of metal constructions.

Installation of thermal oil boiler plant

Year: 2014–2015
Place: Klaipėda, Lithuania
Customer: Orion Global PET, UAB

Pressurized ducts

Year: 2015
Place: France
Accomplished tasks: Manufacturing of pressurized ducts (around 50 t)
Type: Manufacture

Production of steel stack for 14 MW thermal oil boiler plant

Year: 2015
Place: Klaipėda, Lithuania
Customer: Orion Global PET, UAB
Accomplished tasks: Stack design, fabrication, delivery, and erection (height: 65 m, diameter: 2.6 m)

Production of steel stack and ducts for 25 MW power plant

Year: 2015
Place: St. Martin island (France)
Customer: Bouygues Energies & Services
Accomplished tasks: Stack design, fabrication and supervision of erection

Production of 3 stack sets

Year: 2015
Place: Malta
Customer: Aalborg Engineering A/S
Accomplished tasks: Manufacturing of 3 sets of stacks, ducts and silencers according to customer's design (overall tonnage: 500 t)
Type: Manufacture

Framework structures for turbines air intake

Year: 2015
Place: Russia
Customer: Donaldson Europe BVBA (end customer: Siemens)
Accomplished tasks: Manufacturing of framework structures for turbines air intake (200 t)
Type: Manufacture

Installation of air decomposition unit technological equipment and pipelines

Year: 2015
Place: Jonava, Lithuania
Customer: Achema, AB

Enhancement of heat production capacity at the Lithuanian Power Plant

Year: 2014–2015
Place: Elektrėnai, Lithuania
Customer: Lietuvos energijos gamyba, AB
Accomplished tasks: Two separate boiler plants were constructed: a steam boiler plant (thermal capacity: 49,8 MW) and a biomass boiler plant (thermal capacity: 48,8 MW)

Installation of NordBalt converters in Klaipėda

Year: 2015
Place: Klaipėda, Lithuania
Customer: Litgrid, AB

Reconstruction of Krekenava substation

Year: 2015
Place: Krekenava, Panevėžio r., Lithuania
Customer: Litgrid, AB
Accomplished tasks: Full reconstruction of the substation. A new modal control panel was built, electrotechnical equipment of the building was replaced with a new reliable and modern equipment

Production of 2 membrane wall assemblies for biomass boilers

Year: 2015
Place: France
Customer: Leroux et Lotz Technologies
Accomplished tasks: Production of 2 membrane wall assemblies for biomass boilers (overall amount: around 30 t)
Type: Manufacture