Mechanical Works

Design, delivery and installation of 100 MW boiler

Year: 2014–2016
Place: Kohtla-Järve, Estonia
Customer: VKG Energia OÜ (EE)

Disassembling of Methanol Plant

Year: 2015–2016
Place: Fertilizer plant in Jonava, Lithuania
Customer: Iremas, UAB
Accomplished tasks: Disassembling of methanol plant, rectification columns and mechanical equipment as well as loading to vehicles. Overall amount disassembled: 520 t of equipment, 150 t of pipelines and 60 t of metal constructions.

Installation of thermal oil boiler plant

Year: 2014–2015
Place: Klaipėda, Lithuania
Customer: Orion Global PET, UAB

Production of steel stack for 14 MW thermal oil boiler plant

Year: 2015
Place: Klaipėda, Lithuania
Customer: Orion Global PET, UAB
Accomplished tasks: Stack design, fabrication, delivery, and erection (height: 65 m, diameter: 2.6 m)

Production of steel stack and ducts for 25 MW power plant

Year: 2015
Place: St. Martin island (France)
Customer: Bouygues Energies & Services
Accomplished tasks: Stack design, fabrication and supervision of erection

Installation of air decomposition unit technological equipment and pipelines

Year: 2015
Place: Jonava, Lithuania
Customer: Achema, AB

Steel truss production and installation

Year: 2015
Place: Vilnius, Lithuania
Customer: Mitnija, UAB
Accomplished tasks: Production and installation of thick-walled (20–50 mm) rectangular structure – skyscraper truss (240 t).

Generator overhaul in Estonia

Year: 2015
Place: Kohtla-Järve, Estonia
Customer: VKG Energia OÜ

Manufacturing and erection of chimney

Year: 2015
Place: Valmiera, Latvia
Customer: Axis Technologies, UAB
Accomplished tasks: Manufacturing and erection of stack (height: 28.55 m)

Manufacturing and erection of stacks for gas and biomass heating plants

Year: 2014
Place: Elektrėnai Complex, Lithuania
Customer: Lietuvos Energija, AB
Accomplished tasks: Manufacturing, delivery and installation of stacks for gas and biomass heating plants (diameter: 3 m and 3,4 m, height: 50 m and 42 m)

Manufacturing and erection of steel stack

Year: 2014
Place: Biomass heating plant in Šiauliai, Lithuania
Customer: Axis Technologies, UAB
Accomplished tasks: Manufacturing and installation of a steel stack (diameter: 2 m, height: 60 m, single insulated liner inside with mineral wool insulation)

Manufacturing and erection of steel stack

Year: 2014
Place: Biomass heating plant in Utena, Lithuania
Customer: Axis Technologies, UAB
Accomplished tasks: Manufacturing and erection of steel stack (diameter: 2.2 m, height: 40 m, single stainless steel liner inside with mineral wool insulation)

Manufacturing and erection of steel stack

Year: 2014
Place: Raseiniai, Lithuania
Customer: Axis Technologies, UAB
Accomplished tasks: Manufacturing and installation of a steel stack (diameter: 2 m, height: 40 m, single insulated liner inside)

Disassembling, transfer and assembling of water tank

Year: 2014
Place: Elektrėnai Complex, Lithuania
Customer: Lietuvos Energijos Gamyba, AB
Accomplished tasks: Disassembling, transfer and assembling of water tank (capacity: 2200 m3, height x diameter: 14 x 16 m, weight: 67 t)