Thermal Energy Solutions

Design, delivery and installation of 100 MW boiler

Year: 2014–2016
Place: Kohtla-Järve, Estonia
Customer: VKG Energia OÜ (EE)

Installation of thermal oil boiler plant

Year: 2014–2015
Place: Klaipėda, Lithuania
Customer: Orion Global PET, UAB

Enhancement of heat production capacity at the Lithuanian Power Plant

Year: 2014–2015
Place: Elektrėnai, Lithuania
Customer: Lietuvos energijos gamyba, AB
Accomplished tasks: Two separate boiler plants were constructed: a steam boiler plant (thermal capacity: 49,8 MW) and a biomass boiler plant (thermal capacity: 48,8 MW)